Introducing Brandywine Farms: We are thrilled to announce our partnership with Traditions of America for our latest project. This collaboration with the renowned 55+ homebuilder marks a significant milestone for us. With their impressive track record and commitment to the Live Better lifestyle, we share a common goal of enhancing the lives of mature homebuyers. Harvest Run embodies our shared values and dedication to quality, with ambitious plans for moving materials, installing sewer and water pipes, grading lots, constructing curbs, and paving. Together, we aim to create an exceptional 55+ community that exceeds expectations and sets new standards for excellence. Follow our journey as we transform Brandywine Farms and forge a vibrant community for residents to truly live better. Read the full story


360° progressive view of the site, as seen from the Reeceviile Road side.


Aerial Images prior to work beginning. (06/28/23)


First day of stripping topsoil, using a John Deere 9570RX/2412D combination Tractor Scraper. (07/11/23)


Glen Miller Demolition working on the demolition at the Swinehart Rd side of the project. (07/19/23)


Our Dirt Crews continue stripping the topsoil from the site. A pipe crew has installed the first basin outlet. (07/20/23)


A portion of our CAT Equipment that is currently onsite.
2x 349 Excavators, 2x D8R Dozers, 1x D6 Dozer, 1x D4 Dozer, 2x 730 Trucks, 1x CS11 Roller, 1x 563 Roller. (7/23/23)


Bulk Earthwork continues. (7/27/23)


View of the work that has been done on the south side of E Reeceville Rd. (7/28/23)


Mowing cornfields down, digging dirt, and stripping topsoil. (8/03/23)


The dirt crew is excavating material to build a basin on the north side of E Reeceville Rd. (8/09/23)


The pipe crew digging deep for new sanitary sewer on the north side of E Reeceville Rd. (8/15/23)


Both of the John Deere Tractor Scrapers working to strip and stockpile topsoil on the Swinehart Rd side. (8/23/23)


Aerial views of both the Reeceville Road and Swinehart Rd sides of the project. (8/29/23)


Dirt work continues to move forward, Basin outlet pipe being installed. (8/30/23)


Lots continued to be filled and sanitary pipe being installed. (9/5/23)


Demolition work ongoing at existing farm, sanitary pipe installation, lot work continues. (9/6/23)


Pipe crew works to install sanitary sewer as the dirt crew is in full swing moving dirt. (10/03/23)


Sanitary force main installation at the Swinehart Rd side, aerial view of the Reeceville Rd side. (10/11/23)


Basements being dug, sanitary sewer installation on the Reeceville Rd side. (11/16/23)


Concrete curb installation at the Reeceville Rd portion of the site. (12/14/23)


After the curb is installed we begin to set the manhole tops to grade and place road sub-base material. (12/19/23)


After the curb is installed we begin to set the manhole tops to grade and place road sub-base material. (12/20/23 - 12/21/23)


The project called for an off sanitary force main extension to a nearby pump house. (01/24/24)